Grout Systems installed 125 Tiebacks through Sheet Pile with various design loads and 60 Rock Anchors for the construction of a 2.4 million gallon storage basin being built to combine sewer overflows from the existing CSO Rack 22. Rock and soil conditions varied and required redesign as the testing was being performed.