1. Auger Piles—BP-Husky Refinery Reformer 3 Project/Oregon, Ohio
Scope: 626—14", 18", 24", & 30" diameter Augercast Piles – 60'-80' Depth
Duration: September 2010 – December 2010 (Pile Load Test Program completed—Fall 2009)
Construction Manager/Engineering: Kellogg, Brown, & Root, Houston, TX.
Harold Jackson—419-725-0510

2. Auger Piles—ULSD Hydrotreater Marathon Petroleum Company/Canton, OH
Scope: 16" & 24" diameter Augercast Piles – 50'-60' Depth. Three Pile Load Tests (100 ton tested to 300 tons)
Duration: March 2008 – May 2008
Engineering: Burns & McDonnell Engineering Company, Kansas City, MO.
Dick Wechtenhiser—816-823-7116

3. Auger Piles—FGD Retrofit Civil Works Package II (Pennsylvania Power & Light-Brunner Island)/ York Haven, PA
Scope: 791—18" diameter x 35-0" Augercast Piles. 148 — 18" diameter restricted access low headroom piles - 15' of headroom. Restricted Access Low Headroom Piles with an aggregate length of 4,440 L.F.
Duration: June 2007 – August 2007
General Contractor: Stevens Painton Corporation
John J. Murray Jr. & Dave Melder—724-873-4745
Construction Manager: Shaw Stone and Webster

4. Auger Piles—Presque Isle Clubhouse and Racetrack/Erie, PA
Scope: 815—18" & 14" diameter Augercast Piles – 50'-80' depth. Each pile reinforced with a 40' cage. Six pile load tests – 125 ton design load tested to 375 tons
Duration: April 2006 – May 2006
General Contractor: E.E. Austin & Son Inc.
Matt Sahlmann—814-454-7147

5. Auger Pile Cutoff Walls with Tieback Soil Anchors—Alliant Medical Tower/Alliant Health Systems/Louisville, KY
Scope: 500 18" diameter bearing piles 40' depth (150 ton design load tested to 450 tons). Augercast cut-off wall with 3 rows Concrete Walers/Chemical Grouting-Underpinning Service Building/Tension Piles for 300' Tower Crane.
Duration: June 1996 – November 1997
General Contractor: Beers/Whittenberg Construction Company
Pat Noonan—502-361-8891

6. Earth Retention & Auger Piles – ArcelorMittal Walking Beam Reheat Furnace/Steelton, PA
Scope: 550 LF of Pre-drilled soldier beams and lagging with tie-back rock anchors @ +/- 8'-0" designed for a maximum cut of 10'-14' for a total of 7,500 sq. ft. Nine existing sandstone building column footings pinned with tie-back rock anchors installed with thru-beam connections. 26 – 18" diameter Augercast Piles each approximately 30' in length. All piles placed 5' into competent bedrock.
Duration: February 2012 – April 2012
General Contractor: Stevens Engineers & Constructors
Dave Melder – 724-873-1200

7. Auger Piles—New High School/Garfield Heights, OH
Scope: 800—16" diameter Augercast Piles – 20'-80' depth. Bottom 5' into competent rock.
Duration: July 2001 – August 2001
General Contractor: Grout Systems Inc.
A/E: FPS (Arcadis), Dan Casteele—216-781-6177

8. Auger Piles—Galthouse Waterfront Plaza/Arena Garage/Louisville, KY
Scope: 463—18" diameter Augercast Piles each approximately 65'-0" to 71’-0", 12—18" diameter Augercast Piles each approximately 77'-6" to 83'-6". 21—16" diameter Augercast Piles each approximately 55'-0".
Duration: November 2009—January 2010
General Contractor: Whittenberg Construction, Jack Mull—502-361-8891
A/E: Arrasmith Judd Rapp Chovan

9. Auger Piles—Morgan Pretreatment & Residual/Cleveland, OH
Scope: 288—16" diameter Augercast Piles each approximately 70'- 91'.
Duration: May 2010—August 2010
General Contractor: Shook, Matt Bennett—440-838-5400
A/E: Hatch Mott MacDonald

10. Cantilevered Augercast Pile Cut-off Wall—Summa Health System-ACH Emergency Dept. Expansion & Renovation/Akron, OH
Scope: Permanently designed 160' long, 24" diameter cantilevered augercast pile cut-off wall with full-length beam reinforcement for an 8-Story Building. All wall piles installed 20' into sandstone.
Duration: May 2010—June 2010
General Contractor: Hammond Construction, Jeff Mulcahey—330-455-7039
A/E: HFP/Ambuske Architects and Barber/Hoffman

11. Auger Piles—AEP Cardinal Unit 3 Interior Cooling Tower Renovation/Brilliant, OH
Scope: 152—16" diameter Augercast Piles each approximately 50'-0" to 54'-0". Two Compression Pile Load Tests (100 tons tested to 300 tons.)
Duration: April 2010
General Contractor: SPX Cooling Technologies, Tom Herron—913-664-7808
A/E: SPX


We have completed over 600 specialized foundation projects over the past 25 years and the following is
a list of the largest jobs Grout Systems Inc. has performed: